| 1. | The layout of a triangulation system may either be a continuous net as in fig. 1-1 . 三角测量系的布设,可采用图1-1的连续网。 |
| 2. | Buoys are developed 20 miles off the coast 在离海岸200英里的海中布设浮标站网。 |
| 3. | The study of computer aided cable laying system 电缆布设计算机辅助设计系统研究 |
| 4. | Computing method for setting the multiple - curve with 导线法布设卵形曲线的计算方法 |
| 5. | Design and layout of a digital network speech classroom 数字网络语音室的设计与布设 |
| 6. | Set up light well points along east side fence 在场地东侧沿围墙内侧布设轻型井点设备 |
| 7. | All the roads leading to the city had been mined 所有通往这座城市的道路都被布设了地雷。 |
| 8. | The establishment of horizontal control network in the real estate 房地产平面控制网的布设 |
| 9. | Testing chart for qualified identifying 合格鉴定用测试图形和布设总图 |