Chinese translation for "挖方工程"
|
- cutting works
excavating work excavation and cart-away
Related Translations:
挖方: excavation (of earth or stone); cut; cubage of excavation excavation挖方: excavation (of earth or stone); cut; cubage of 挖方体积: excavated volumevolume of excavation 挖方机械: negative appliances 挖方支撑: planking and struttingsheeting for excavationtimbering of a cut
- Example Sentences:
| 1. | Analysis of slope stability is one of the most important problems in geotechnical engineering . the stability of all kinds of natural slope , higeway , airport , refuse dump , dam , fill , excavation need to be analysed 在土木工程中,边坡稳定分析十分重要,如各种各样的天然边坡、高速公路、机场、填埋场、土石坝工程、各种填方、挖方工程等等都需要进行稳定分析。 |
- Similar Words:
- "挖耳勺" Chinese translation, "挖耳子草" Chinese translation, "挖法" Chinese translation, "挖方" Chinese translation, "挖方底土" Chinese translation, "挖方和填方计算" Chinese translation, "挖方滑坡" Chinese translation, "挖方机械" Chinese translation, "挖方量" Chinese translation, "挖方坡度" Chinese translation
|
|
|