| 1. | Remote control test for fire pump and emergency fire pump 消防泵、应急消防泵遥控操作试验。 |
| 2. | Machine tools - geometric accuracy tests and practical tests - test methods 机床.几何精度试验和操作试验.试验方法 |
| 3. | Abnormal operation test 非正常操作试验 |
| 4. | Operation test of emergency switching - off device for oil pump and ventilator ( bilge pump ) in engine room 机舱风、油(舱底泵)应急切断装置操作试验。 |
| 5. | Response elements were modified based on feedback from the ws - rm interoperability workshop conducted in may 2004 元素根据2004年3月执行的ws - rm互操作试验的反馈进行了修改。 |
| 6. | Connectors for electronic equipment - tests and measurements - mechanical operation tests - test 13e : polarizing and keying method 电子设备用连接器.试验和测量.机械操作试验.试验13e :偏振和关键方法 |
| 7. | The improvements can be largely attributed to implementation experience and the great feedback received during the interoperability workshop see 这种提高在很大程度上归功与实践经验以及在互操作试验(参见 |
| 8. | Connectors for electronic equipment - tests and measurements - part 13 - 1 : mechanical operating tests - test 13a : engaging and separating forces 电子设备连接器.试验和测量.第13 - 1部分:机械操作试验.试验13a :啮合力及离散力 |
| 9. | Vde specification for operating , testing and safe - guarding devices used when carrying out live - line - work on equipment with rated voltages exceeding 1 kv ; part 3 : fuse tongs 在额定电压大于1kv的带电设备上工作时进行操作试验 |
| 10. | Vde specification for operating testing , and safe - guarding devices used when carrying out live - line - work on equipment with rated voltages exceeding 1 kv ; part 2 : operating rods 在额定电压大于1kv的带电设备上工作时进行操作试验 |