| 1. | Practice and analysis of splashing slag in converter at pzh steel 攀钢转炉溅渣护炉的实践与分析 |
| 2. | Some experiences of establishing pangang ’ s oas are following 参与攀钢oa系统建设项目的几点经验。 |
| 3. | The paper primarily solved the problem on pangang development 本论文基本解决了攀钢未来发展的取向问题。 |
| 4. | A review and prospect for development of cold rolled steel sheet at pzh steel 攀钢冷轧钢板产品的开发回顾与展望 |
| 5. | The actual practice showed that the pangang ’ s oas was safe indeed 攀钢oa的实际运行结果表明,该体系确实是安全的。 |
| 6. | Comprehensive utilization of blast furnace gas mud from panzhihua iron amp; amp; steel co 攀钢高炉瓦斯泥的综合利用 |
| 7. | Application of water cooling technology of furnace bottom in 120m3 blast furnace at laigang 影响攀钢高炉铁沟料使用寿命的因素 |
| 8. | Design and production practice of hot air stove of no . 1 bf in panzhihua iron and steel co 攀钢1号高炉热风炉的设计及生产实践 |
| 9. | This project was judged and approved by pangang iron and steel co . in april of 2000 该项目于2000年通过攀钢(集团)公司鉴定。 |
| 10. | Adhere to principle of independent innovation and make great efforts to build innovation - type pansteel 坚持自主创新努力建设创新型攀钢 |