Chinese translation for "施工企业管理"
|
- construction enterprise management
Related Translations:
企业管理硕士学位: dess caaemaster of business administration 水利工程施工: hydraulic engineering construction 施工队长: spread superintendent 施工编号: construction number 施工车辆: construction vehicle 施工监测: observation during and after construction 施工规程: construction regulations 铺面施工: pavement construction 施工技术: co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
- Example Sentences:
| 1. | On the management innovation in oil construction enterprises 谈石油施工企业管理创新 | | 2. | Development of information management system on highway construction enterprise 公路施工企业管理信息系统的建设 | | 3. | Sinopec ' s construction enterprises management association reports 中国石化集团公司施工企业管理协会秘书处规划下半年协会工作 | | 4. | Construction items are representatives of architecture corporations in the construction market . the management of construction items is the basis and important method of construction corporation management 施工项目是建筑企业面向建筑市场的窗口,施工项目管理是施工企业管理的基础和重要方法。 | | 5. | Building enterprise management means policy making , planning , organizing , ordering , coordinating , controlling and inspiriting in the production and operation of building construction enterprise in order to guarantee the task fulfillment of the building construction enterprise 建筑施工企业管理是指对建筑施工企业的生产经营活动进行决策、计划、组织、指挥、协调、控制和激励,以保证建筑施工企业任务的完成。 | | 6. | Published professional books about ultra - long concrete base slab construction in basement , large area terrazzo floor construction ; be competent for consultative work on building construction , construction technique , construction company management and construction supervision , etc 本人在“地下室超长混凝土底板施工” 、 “大面积水磨石地坪施工”有专著;能胜任建筑施工、施工技术、施工企业管理,建筑监理方面咨询工作。 | | 7. | In this article it is concluded that the factors , which confine the claim for compensation , include : the low management level of the electric construction companies , the inadequate claiming ability of the companies , the nonstandard market and the unfit legal system etc . none but the government , the society and the companies effort together to intensify the legal system construction , standard the market rules , improve the comprehensive ability , can we build a good construction reclaiming circumstance and can the companies improve the reclaiming ability effectively 本文认为,目前制约电力施工企业顺利解决施工索赔问题的主要因素有:电力施工企业管理水平不高;企业索赔能力不强;市场不规范;法制不健全等。只有通过政府、社会、企业共同努力,加强法制建设,规范市场秩序,提高企业综合素质,才能形成一个良好的施工索赔环境,企业也才能有效提高施工索赔能力。 | | 8. | The paper studied the management method reformation of construction enterprises in the choosing of organization form and the three major target management ( quality , progress and cost ) innovation and technical improvement . this paper also brought up the principle for choosing the form of organization mechanism ; analyzes the factors which affects the construction quality , progress and cost . based on this , it proposed a new method for full quality management and whole course dynamic progress managing as well as cost managing 论文重点研究了工程项目管理在组织机构选择和三大目标控制(质量、进度和成本)方面的管理方法改革和技术措施改进;给出了施工企业选择项目管理组织机构的原则;对影响施工质量、进度及成本的因素进行了分析,在此基础上,针对施工企业管理中存在的问题,提出了全面质量管理、全过程动态进度管理和成本管理的新方法。 |
- Similar Words:
- "施工期限" Chinese translation, "施工期涨价" Chinese translation, "施工起重机" Chinese translation, "施工起重塔架" Chinese translation, "施工企业" Chinese translation, "施工企业会计" Chinese translation, "施工企业自有流动资金" Chinese translation, "施工千斤顶" Chinese translation, "施工前" Chinese translation, "施工前测量" Chinese translation
|
|
|