Chinese translation for "施工步骤"
|
- construction procedure; construction steps
construction steps
Related Translations:
水利工程施工: hydraulic engineering construction 施工队长: spread superintendent 施工编号: construction number 施工车辆: construction vehicle 施工监测: observation during and after construction 施工规程: construction regulations 铺面施工: pavement construction 施工技术: co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
- Example Sentences:
| 1. | This paper analyzes the principles , advantages , characteristics and construction procedures of impact compaction technique 摘要分析了冲击压实技术原理、优势以及冲击压实技术特点和施工步骤。 | | 2. | The computing model is optimized according to the model board trolley installation form and the concrete pouring process 根据现场测量时模板台车的结构安装形式和混凝土浇注的施工步骤,反复修整完善计算模型。 | | 3. | The development general situation of external thermal insulation technology for external wall , its typical construction procedure and the thermal insulation performance are introduced 摘要介绍了外墙外保温技术的发展概况,外墙外保温系统典型的施工步骤及保温性能。 | | 4. | This paper introduces a new construction method of lowering ground water level suitable for sandy soil area regarding preparation of construction equipment and materials , construction procedure , attentive matters for construction and so on 文章从施工设备及材料的准备、施工步骤、施工注意事项等方面介绍了一种适用于砂土地区降水的新方法。 | | 5. | Abstract : taking a trial lot as example , this paper expounds the application of heavy tamping in the construction of subgrade focusing on its procedure , detection , quality control and result 文摘:以一工程试验段为例,说明了强夯法在路基施工中的应用,主要介绍了试验手段强夯施工的施工步骤、注意事项、检测手段及方法、质量保证措施及试验段结果。 | | 6. | Based on the engineering practice of the waihuan station in shanghai urban mass transit line 9 , this paper analyses the structure form of the deep foundation pit and the key - nodes design by using the top - down invert method , so as to optimize the engineering 摘要以上海轨道交通9号线外环路站为实例,介绍了部分逆筑法施工的地铁车站深墓坑围护结构形式,及其结构设计;着重介绍了基坑围护结构的计算模型设定、基坑稳定性计算,及围护结构的基础施工步骤。 | | 7. | Taking the sucessful control experiences in previous cable - stayed bridge construction into consideration , the control principles and methods for gonghe bridge , that is controling the stress of both the top and bottom sides of main beam , regarding the second stretching as the hauling cable force method , are offered , and related construction procedures for all construction stages are designed 在总结前人对斜拉桥施工控制经验的基础上,针对公和斜拉桥施工控制提出了相应的控制原则和方法,即以“控制主梁上下缘应力”为主梁内力控制原则,以“二次张拉”为斜拉索索力控制的方法,并根据各施工阶段的具体需要设计相应的施工步骤。 | | 8. | During construction procedure , the stressing of diaphragm beams " tendons and the tensioning of cables interact , the contacting nonlinear issues between girder and form plate etc , which require detailed analysis , arrange the orders and quantities of the stressing of the cables and tendons properly , and guide the construction . the paper , by making plane model and spacial model of yongan bridge , calculated the pre - closure cable forces ( aim forces ) with plane element program , with the help of applied structure analysis program - ansys , acquired the reasonable construction steps of tensioning of tendons and cables 本论文采用自编平面杆系施工装配计算程序和大型结构分析程序- ansys ,通过分别建立该桥的平面和空间模型(含模板的作用模拟) ,由平面杆系程序倒拆出斜拉索合拢前的索力(目标索力) ,利用ansys结构分析程序,经过多次的施工过程模拟计算之后得出达到目标索力的合理的施工步骤。 |
- Similar Words:
- "施工布局" Chinese translation, "施工布置" Chinese translation, "施工布置图" Chinese translation, "施工布置图 施工计划 施工平面图" Chinese translation, "施工步道" Chinese translation, "施工部署计划" Chinese translation, "施工材料费用" Chinese translation, "施工材料和建筑" Chinese translation, "施工材料和设备的付款" Chinese translation, "施工材料目录" Chinese translation
|
|
|