Mobile
Log In Sign Up
Home > english-chinese > "施工经理" in Chinese

Chinese translation for "施工经理"

construction manager

Related Translations:
水利工程施工:  hydraulic engineering construction
施工队长:  spread superintendent
作业施工:  job execution
施工编号:  construction number
施工车辆:  construction vehicle
施工监测:  observation during and after construction
施工规程:  construction regulations
铺面施工:  pavement construction
施工技术:  co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
施工绞车:  builders winch
Example Sentences:
1.Inspecting on - site progress and reporting to pe or cm on a daily basis , making progress photos on a weekly basis
每天检查现场进度,并汇报给项目工程师或施工经理,每周拍下进度照片。
2.Before stacking any material the contractor must consult the construction manager or his nominee for allocation of a stacking area
《承包商》堆放材料前,必须事先询问负责材料堆放场地分配的《施工经理》 。
3.Advise ipmt construction director and contractors ' construction managers on best practice and hse program developments
为烯烃项目一体化管理组的施工主任和承包商的施工经理就如何制订最佳的施工惯例和hse计划出谋划策。
4.Minimum 2 international industry project experience on pm or cm ' s role in epcm contractor or construction contractor ' s team
作为施工经理或者项目经理在工程公司或者施工承包商的团队中,参与过2个以上的国际工业工程项目。
5.Advise ncpp ipmt construction director and contractors ' construction managers on best practice and hsse program developments
为宁煤烯烃项目一体化管理组的施工主任和承包商的施工经理就如何制订最佳的施工惯例和hsse计划出谋划策。
6.The contractor ' s workforce will not be allowed to commence work on site until all certification has been presented to the construction manager or his nominee
在承包商未向施工经理或其指定人提供所有施工资质证件前,承包商施工队伍不得开展任何现场施工工作。
7.Before doing any work where there is a danger of coming into contact with electric wires or collector rails arrangements must be made for access with the construction manager or his nominee
在存在接触电线或电器轨道危险的地区进行工作之前,必须和《施工经理》安排设置通道。
8.All mobile equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required
所有移动设备首次抵达现场时,必须由现场施工经理或其指定人进行检查。并且,在需要的时候,应携带所需检查设备的现行申明证书。
9.All contractors ' equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required
所有承包商设备首次抵达现场时,必须通过施工经理或其指定人的检查。并且,如果需要还需要检查承包商所有的现行作业证书。
10.No excavation shall be started nor any peg or spike driven into the ground until an excavation permit has been granted by the construction manager or his nominee in accordance with the excavation permit procedures
在取得“施工经理”根据《开挖许可》程序,给予施工许可以前,不可进行开挖,也不得向地下打入短桩或大钉。
Similar Words:
"施工进场坡道" Chinese translation, "施工进度" Chinese translation, "施工进度表" Chinese translation, "施工进度计划" Chinese translation, "施工经济学" Chinese translation, "施工经验" Chinese translation, "施工卷扬机" Chinese translation, "施工开始" Chinese translation, "施工勘察" Chinese translation, "施工可能性" Chinese translation