Mobile
Log In Sign Up
Home > english-chinese > "施工费用" in Chinese

Chinese translation for "施工费用"

construction cost
executive cost
expenditure on construction
project costs


Related Translations:
水利工程施工:  hydraulic engineering construction
施工队长:  spread superintendent
作业施工:  job execution
施工编号:  construction number
施工车辆:  construction vehicle
施工监测:  observation during and after construction
施工规程:  construction regulations
铺面施工:  pavement construction
施工技术:  co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
施工绞车:  builders winch
Example Sentences:
1.Therefore , the following passage mainly investigates the problems existing in construction expenditure compensation - claiming and the countermeasures
本文主要研究施工费用索赔存在问题及其对策。
2.Using the suggested design and construction methods can not only save construction materials , but also improve its seismic property
采用本文建议的方法,不仅能够节约节点的材料用量和施工费用,而且抗震性能更好。
3.A package of solution with electric and cabling system will greatly reduce the design and construction investment , building and management cost
电气、弱电布线系统的一揽子解决方案将大大降低设计和施工费用,降低建筑和管理成本。
4.It is a means to compensate the loss with the emergence of construction risks and a main target of the contractors who claim for compensation
施工费用索赔是施工索赔的重要组成部分,它伴随施工风险而产生的一种对损失的补偿手段,是承包商进行索赔的主要目标。
5.So there is great significance in reality to minimize the expenses by studying the relationship among the scheme , machine matching and the cost optimization in construction
因此,针对如何加强碾压混凝土坝施工方案、机械配套和费用优化问题等展开研究,使其施工费用最低,必将具有重大的现实意义。
6.At the same time , this paper analysize the effect of mechanism of distortion of slope , the destoryed - type of slpoe , the manner of reinforcing slpoe and the charge of construction on installed angle of anchor bar
同时本文分析了在岩质边坡锚固工程中边坡的破坏机理、加固方式、施工费用等对锚杆最优安装角的影响。
7.The damming technique is relatively perfect now , but because of the problems in construction management are more and more severe , such as construction scheme and matching machine , which manifest the high construction expenses
虽然碾压混凝土筑坝技术已达到较成熟的地步,但是由于采用不同施工组织方案和机械配套方面存在的施工管理问题越来越突出,这集中反映了碾压混凝土坝施工费用的巨大浪费。
8.Restrained by a variety of participants from the architecture market themselves and objective conditions , there is a series of problems with construction expenditure compensation - claiming , which critically affect the benefits of enterprises and constrain their existence and development
受到来自建筑市场各种主体本身和客观条件的阻碍,导致施工费用索赔工作存在一系列问题。这些问题严重影响企业的经济效益,制约了企业的生存和发展。
9.On this basis , this passage will at last focus on the research of related countermeasures according to the problems of expenditure compensation - claiming and then demonstrate that contractors " right to claim for compensation and counting the compensation reasonably are vital to solve the problem of expenditure compensation - claiming
本文在对国际工程费用索赔的计价方法内容、国际工程解决费用索赔争端的技术分析、探讨和国内施工费用索赔存在问题分析基础上,最后重点对施工费用索赔存在问题采取相应对策的研究。并通过施工费用索赔案例评析、论证承包商的索赔权及合理计算索赔款额是解决费用索赔问题的关键。
10.This paper depicts the engineering outline of the pipeline crossing project as well as a series of new construction methods such as integral pipeline prefabrication , trenching layer by layer , integral lowering pipeline into trench and integral pressure testing , which speed up the construction progress and reduce the construction cost
文章介绍了穿越段的工程概况以及管道整体预制、管沟分层开挖、管道整体下沟和整体试压等一系列新的施工方法,该方法加快了施工进度,节约了施工费用
Similar Words:
"施工方格网" Chinese translation, "施工方式" Chinese translation, "施工妨碍" Chinese translation, "施工放样" Chinese translation, "施工废弃物" Chinese translation, "施工费用, 工程项目成本" Chinese translation, "施工分期付款" Chinese translation, "施工封闭线路" Chinese translation, "施工缝" Chinese translation, "施工缝 工作缝 构造缝" Chinese translation