| 1. | Probe into the engineering mechanical completion and final acceptance optimization 工程机械竣工和最终验收优化的探讨 |
| 2. | System installation includes start - up and performance test and will be carried out by the service engineer of c & s company 中瑞公司负责测量机的安装、调试以及测量机安装现场的最终验收。 |
| 3. | Responsibilities : the mechanical engineer is in charge of the project from the design to the commissioning and final acceptance of the equipments 岗位职责:机械技术工程师负责从设备设计、现场调试到最终验收的一系列工作。 |
| 4. | Packaging - requirements for packaging recoverable through composting and biodegradation - test scheme and evaluation criteria for the final acceptance of packaging 包装.通过合成及生物降解规定包装可回收性的求.试验计划和包装最终验收评定标准 |
| 5. | The warranty period shall be 12 months counting from the date on which the buyer , the end - user and the seller sign the certificate of final acceptance of the contract goods 保证期自买方,最终用户和卖方签署合同货物最终验收证书之日起十二个月。 |
| 6. | Packaging - requirements for packaging recoverable through compositing and biodegradation - test scheme and evaluation criteria for the final acceptance of packaging 包装.对通过合成和生物降解产生的可回收包装材料的要求.包装材料最终验收的试验计划和评价标准 |
| 7. | The guarantee period of the equipment supplied by the seller shall expire after 12 ( twele ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract 卖方所提供的设备保质期按照合同第七章的规定:从最终验收合格证书接受日开始算起,有效期为壹年( 12个月) 。 |
| 8. | The guarantee period of the equipment supplied by the seller shall expire after 12 ( twelve ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract 卖方所提供的设备保质期按照合同第七章的规定:从最终验收合格证书接受日开始算起,有效期为壹年( 12个月) 。 |