| 1. | The towers are 170 ft above the caisson . 沉井以上的塔柱高度为170英尺。 |
| 2. | The construction technology for sinking well of pfa layer 粉煤灰层沉井施工技术 |
| 3. | Supersonic deep - well detector for submerged shaft sinking 淹水沉井超声波深井测探仪 |
| 4. | Construction of pylon pier caisson of haikou shiji bridge 海口世纪大桥主墩沉井施工 |
| 5. | Construction technique of sand brick sinking pile in deep water 深水河中砖沉井挖孔桩施工技术 |
| 6. | Experience of sunk well construction in the basis of basement 高层建筑地下室基础沉井施工经验浅谈 |
| 7. | Saveral methods to build sinking well 沉井施工的几种方法 |
| 8. | The methods for treating the sand drifting in the construction of the sunken shaft 关于沉井施工中流沙的处理方法 |
| 9. | Open - end caisson foundation 深基础沉井基础 |
| 10. | The technique and application of the cast - in - site bored pile post - grouting construction 薄壁沉井法在挖孔桩基础施工中的应用 |