Mobile
Log In Sign Up
Home > english-chinese > "泄水闸" in Chinese

Chinese translation for "泄水闸"

[ xièshuǐzhá ]
discharge sluice
discharging sluice
escape sluice
outlet sluice
release sluice
sluice gate
water release gate


Related Translations:
泄水时间:  emptying valvetime of emptying
开闸泄水:  sluicing
泄水栓:  clearing plug
泄水道:  drain trunkdraintrunkflashwayoffletscour outletsluicewayspillwaytapping pipewater escape
泄水主管:  main drain
泄水建筑物:  escape worksoutlet structure;sluice works;outworksrelease workswater release structure
泄水带:  zone of discharge
锅炉泄水:  boiler drainage
泄水孔:  bleederdewatering orificedischarge orificedrain holedrainage holedrainage openingoutgateoutlet entrancescu erscupperspillwayweep holeweep-hole
泄水波:  release wave
Example Sentences:
1.Reinnovation of erjiang discharging sluice automatic monitoring system at gezhouba project
葛洲坝二江泄水闸自动监测系统更新改造
2.Computerized supervisory and control system for discharge sluice in feilai gorge hydraulic project in guangdong
飞来峡水利枢纽工程泄水闸计算机监控系统
3.The pier room being a sophisticated spatial structure system , conventional methods in material mechanics and structure mechanics find difficulty in describing the real burdening situation , which presents embarrassment in designing
泄水闸室属于一种复杂的空间结构体系,传统的材料力学,结构力学方法难以真实的反映其受力状态,必然给设计工作带来一定的困难。
4.Abstract : the computerized supervisory and control system for dischargesluice in feilai gorge hydraulic project in guangdong province is introduced , and the hardware and software design and the functions of this system are presented
文摘:介绍了广东省飞来峡水利枢纽工程泄水闸计算机监控系统,并对该系统的硬件设计、软件设计进行了描述,同时对该系统的功能进行了介绍
5.To provide necessary data for design bypass pipe , an enlargement to bi liu river reservoir , the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects , measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station , the hydraulic characteristics of the water tunnel and draw - off pipe , the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station
大连市碧流河水库供水工程取水头部由引水渡槽、节制闸、进水闸、泄水闸等建筑物组成。由于本工程场地条件限制,增设旁通管后布置非常紧凑,管道急转角度大且转弯距离较小,对于管内水流流态是否满足要求,需要经过模型试验进行论证,以确保工程的可靠性。旁通管具有上水与泄水要求,对其过流能力也要经试验确定,为碧流河水库增建旁通管设计提供依据。
Similar Words:
"泄水系统" Chinese translation, "泄水系统布置图" Chinese translation, "泄水箱" Chinese translation, "泄水旋塞" Chinese translation, "泄水堰" Chinese translation, "泄水闸板" Chinese translation, "泄水闸门" Chinese translation, "泄水闸门下缘" Chinese translation, "泄水闸室" Chinese translation, "泄水闸通道量" Chinese translation