Mobile
Log In Sign Up
Home > english-chinese > "浇梁" in Chinese

Chinese translation for "浇梁"

shallow beam

Related Translations:
浇池:  pouring basin
浇合:  casting-in
浇管:  depositing
浇底:  jiaodi
焙浇:  roast
浇焊:  [冶金学] flow welding
浇封:  encapsulation(ex m)
浇合的:  cast-in
边缘浇口:  edge gating
浇混凝土设备:  placing plant
Example Sentences:
1.Construction , management and monitoring of suspension girder of bridge over liao river on tianzhuangtai
田庄台辽河公路大桥悬浇梁施工测量监测
2.Summary on installation method of working platform for construction of cast - in - place viaduct girder in urban transit system
城市轨道交通工程高架线路现浇梁施工作业平台搭设方法总结
3.The results indicate that shear resistance of composite beam accounts for 1 . 0 ~ 1 . 14 times of that of cast - on - site concrete beam
该分析结果表明,叠合梁的斜截面承载力是整浇梁的1 . 00 ~ 1 . 14倍。
4.4 . wind load has great influence on construction , but the self error of casting girder and basket load have greater influence , especially , basket falling is directly responsible for the safety of construction
4 .得到风载对施工期可靠度影响比较大,而已浇梁段的自重偏差和挂篮荷载影响很大,特别是挂篮跌落直接关系到施工期桥梁的安全性。
5.At the finishing of this paper , the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams . through the forecasting , the constructing state is in coincidence with the designing state . during the bridge construction process , the value of designing parameters are made close to the construction state by means of data collections , optimal controls and detailed analysis of different reasons that caused errors
最后,根据施工的实际状态对设计参数进行了有效的识别,并利用灰色理论与预测控制相结合的方法,根据已浇梁段的实际状况对下一施工梁段的立模标高和斜拉索张拉索力进行预测,使施工过程中的受力状态与已确定的合理施工状态达到一致。
6.2 . the random nature of load construction is analyzed . according to analyze various factors on change of reliability index , casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling , which influence on construction reliability of rigid frame bridge with high - pier and large - span , are obtained
2 .研究了各施工荷载的随机性,通过分析各种影响因素对可靠指标的变化程度,得到已浇梁段、施工分布活载、混凝土强度、风载和施工荷载偏差以及挂篮跌落等对高墩大跨刚构桥施工期可靠度的影响。
Similar Words:
"浇沥青" Chinese translation, "浇沥青机" Chinese translation, "浇沥青透层" Chinese translation, "浇沥青用工具" Chinese translation, "浇连续梁滑移模架" Chinese translation, "浇料口" Chinese translation, "浇流系方案" Chinese translation, "浇流系统" Chinese translation, "浇卤牛肉" Chinese translation, "浇满" Chinese translation