Chinese translation for "深开挖"
|
- deeexcavation
heavy cut
Related Translations:
结构开挖: structural excavationstructure excavation 地基开挖: foundation dredging 开挖线: excavation lineexcavatoin lineline of excavation 开挖面: cut surfaceexcavated surfaceface 开挖机械: excavating machineexcavation machinery 开挖隧道: tunnel worktunnelingtunnelling 人工开挖: hand excavationmanual excavation
- Example Sentences:
| 1. | Slope instability problems ; piles ; excavations ; tunnels 斜坡的不稳定性;桩;深开挖;隧道 | | 2. | Deep excavation and building protection 深开挖工程及建物保护 | | 3. | Practice amp; discussion on non curtain deep excavating dewatering engineering 无帷幕深开挖降水工程实践及问题探讨 | | 4. | This paper also presents a quantitative method to evaluate this creep effect 本研究也提出一个可以评估深开挖土壤潜变效应的量化评估方法。 | | 5. | Bridges , high - rise buildings , underground structures , tunnels , retaining structures for deep excavations 桥梁高层建筑地下结构物隧道深开挖挡土结构 | | 6. | Not only deformation was controlled , but also cost and engineering time were reduced 作为大面积、深开挖的基坑工程既控制基坑变形又达到降低工程造价、缩短工期的目的。 | | 7. | This paper presents the time - dependent performance of an well - instrumented excavation case using the top - down construction method 摘要本文以一个有完整监测资料之深开挖案例来探讨其依时变形行为。 | | 8. | In other words , soil creep may make significant contributions to diaphragm wall displacement and ground settlement in a deep excavation project in soft clay strata 也就是说,对一个座落于粘土地层的深开挖工程而言,土壤潜变可能对壁体侧向变形及地表沈陷有显著的贡献。 | | 9. | In this paper , author compare with shenzhen holiday plaza project ( be known as firstly deepest foundation pit , deepest excavation depth is 21m ) , use combinative method for theory guidance , test study , simulation analysis , project application and information feedback , entirely and deeply study prestress anchor cable composite soil nail , and also make a pilot study for deformation of pile anchor composite soil nail 本文以深圳假日广场深基坑支护工程(号称“深圳第一坑” ,最深开挖21m )为背景,采用了理论指导、试验研究、模拟分析、工程应用和信息反馈相结合的方法,对预应力锚索复合土钉支护结构进行了全面深入的研究,对桩锚式复合土钉支护结构的变形进行了初步研究。 | | 10. | This manner of change reflected the great influence of texture to rock mass quality . rock mass mechanical parameters corresponding to individual rock mass quality at different levels are determined by means of correlation analysis and statistical analysis . results show that calculation outcomes match well with measured mechanical parameters 研究结果表明:对于混凝土重力坝,按照现在的深开挖方案,坝肩开挖后,土石方开挖量高达820x10 ‘ m ‘ ,且在72dri高程至坡顶将产生大范围的破坏区,采用工程治理将带来巨额的费用。 |
- Similar Words:
- "深咖啡色的" Chinese translation, "深卡其布" Chinese translation, "深卡其色" Chinese translation, "深卡叽布" Chinese translation, "深开采" Chinese translation, "深开挖工程及建物保护" Chinese translation, "深砍" Chinese translation, "深拷贝" Chinese translation, "深科技" Chinese translation, "深壳岩浆源" Chinese translation
|
|
|