| 1. | Study of damage behaviour of shapai rcc arch dam 沙牌碾压混凝土拱坝损伤开裂分析 |
| 2. | Flexible rcc arch dam on a weak foundation 软弱地基上的碾压混凝土拱坝应力与位移分析 |
| 3. | Design specification for concrete arch dams 混凝土拱坝设计规范 |
| 4. | The pilot study of causes of cracks in puding rcc arch dam 高碾压混凝土拱坝分缝形式及破坏机理研究 |
| 5. | Study on joint types and destructive mechanism of high rcc arch dams 普定碾压混凝土拱坝裂缝成因探讨 |
| 6. | Asymmetric construction of steel pipe concrete arch rib tied arch bridge 钢管混凝土拱肋系杆拱桥不对称施工 |
| 7. | Comparative analysis of structural model destruction tests of two arch dams 两座碾压混凝土拱坝结构模型破坏试验对比分析 |
| 8. | Scaffolding construction of concrete filled steel tube arch bridge with no wind - support system 无风撑钢管混凝土拱肋的支架施工 |
| 9. | Analysis of stresses and displacement for roller compacted concrete arch dam on a weak foundation 柔性拱和软弱地基上的碾压混凝土拱坝 |
| 10. | Therefore the change of temperature has great effect on the stresses of concrete arch dam 因此,温度变化对混凝土拱坝的应力状态具有重要的影响。 |