Chinese translation for "渣场"
|
- slag yard
Related Translations:
渣皮: slag crustslag skinslag skull 电石渣: acetylene residueacetylene sludgecarbide ashcarbide mud residuecarbide slag 短渣: falling slagshort slag
- Example Sentences:
| 1. | Evaluationmethod of environment risk of large scale of phosphogypsum stacking area 大型磷石膏渣场环境风险评价方法 | | 2. | Study of engineering measures for water and soil conservation of water conservancy and hydroelectric projects disposal areas 水利水电工程弃渣场水土保持工程措施研究 | | 3. | The tiaohuaxi stream , liangtanhe river and the huangshaxi rubbish dump will improve the investment and the living environment , and satisfy the needs of living and production 正在整治的桃花溪流域、梁滩河流域以及黄沙溪渣场等工程,将改善投资和生活环境,满足生产和生活需要。 | | 4. | Moreover , the design scheme of gypsum st ack is assessed on the basis of above test results , some suitable engineering me asures are suggested to take to ensure the stability of gypsum stack 在此基础上,对设计部门提出的渣场工程设计方案进行了较为全面的技术论证,得出了若干有意义的结论和建议,为该工程的设计和施工提供了科学依据。 | | 5. | Thebasic evaluation process , method and stages involved in the structure of environment riskevaluation of tailingdam type of stacking area were introduced . a concrete method forenvironment risk evaluation of phosphogypsum stacking area was introduced by a example . areference and a comparison were offered to the environment risk evaluation of largeandmedium scale of chemical industry waste stacking area by the method 对尾矿坝类渣场的环境风险评价框架结构中涉及的各个阶段及基本评价过程与方法作了简要的介绍,并通过实例介绍如何进行磷石膏渣场的环境风险评价工作,具有典型性和参照性,可作为国内大中型化工废物渣场环境风险评价的参照和类比。 | | 6. | " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures " , the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level . the research findings were adopted in such large - scale projects as the tianshengqiao water contral project , ming tombs water control project . dahe water contral project , ming tombs water control project , dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power . ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power . ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit . ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit . ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir “高堆石坝原位观测和反溃分析研究”及“高土石坝动力分析及抗震工程措施研究”咨询项目提出了具有开拓性的观点与方法,经电力工业部鉴定评为国际先进水平,该两项成果已应用于天生桥、十三陵、大河、莲花等大型工程获电力工业部科技进步二等奖; “坝料土动力应力应变关系的研究”咨询项目获电力工业部科技进步二等奖, “徐州发电厂灰坝加固工程勘测试验与计算分析”咨询成果已被华东电力设计院设计采纳,工程效益显著; “瓮福磷石膏渣场工程土工试验与数值分析”咨询成果已应用于国家重点工程瓮福矿肥基地建设,效益显著; “克孜尔水库工程原型观测数据库与资料分析”咨询项目为水库运行与管理提供了有力保证。 | | 7. | The soil erosion is effectively prevented from the project construction of the water conveyance project for dahuofang reservoir by taking both the project of high way reform and the river traning project as the key points ; in which the measures to prevent the soil erosion are made for the spoils piled up with different types in all the spoil areas therein , and then the spoil is used to build high way and dike concerned as well 摘要大伙房水库输水工程以公路改造和河道规划整治项目为着手点,利用渣料修路筑堤;根据各渣场堆放形式的不同而采取不同的防治措施,可有效地防止工程施工可能造成的水土流失。 | | 8. | The 1 , 000 , 000 ton dimethl ether project is making the project by the juye lu - lin mining industry corporation to be possible to grind the report , the project application report , the safety evaluation report , the environment appraisal report , the occupational disease appraise report , the earthquake , the disaster , the water resources proof , the conservation of water and soil , reports and ash dregs depth of field penetrability appraisal and so on 巨野县100万吨二甲醚项目由巨野鲁鳞矿业集团公司正在做项目可研报告、项目申请报告、安全评价报告、环境评价报告、职业病评价报告、地震、地灾、水资源论证、水土保持、灰渣场深透性评价等报告。 | | 9. | Among the 130 debris flow valleys , dazhai gully suspends high on the up range of baihetan hydropower station , with an altitude over 970 m and a drop more than 350 m . gravels , mud and flood in this valley brings the construction site in great danger . 3 kilometers upriver from the mouth of dazhai gully , lies the haizi gully , which is also frequented by debris flows , but will be taken as the dumping site for the construction 库区130条泥石流沟中大寨沟以沟口海拔970余米的高程和350余米的落差高悬于白鹤滩水电站的大坝上方,其沟内泥石流带来的砾石、泥沙与洪水直接威胁着电站建设工地和枢纽的安全;紧邻大寨沟沟口上游约3km的海子沟则为一条泥石流活动频繁的沟谷,因其出口将作为水电站建设的弃渣场地,流域内的泥石流活动关系着水电站建设中弃渣场的安危。 |
- Similar Words:
- "渣饼法" Chinese translation, "渣饼试验" Chinese translation, "渣槽" Chinese translation, "渣层" Chinese translation, "渣层厚度" Chinese translation, "渣场运输机" Chinese translation, "渣车" Chinese translation, "渣车桶" Chinese translation, "渣池" Chinese translation, "渣池电压" Chinese translation
|
|
|