Chinese translation for "湿接头"
|
- wet connector
Related Translations:
接头: 1.(连接起来) connect; join; joint 短语和例子把两根管子接头 connect two pipes2.(找人联系) contact; get in touch with; meet 短语和例子接头地点 contact point; rendezvous; 我明天和他接头。 i shall get in touch with him tomorrow.3
- Example Sentences:
| 1. | Introduced are wet - connector horizontal well logging techniques and problems in application 介绍了湿接头水平测井工艺,以及现场运用中存在的主要问题并提出了解决措施。 | | 2. | This article reviews the advantages and the disadvantages of two kind of logging construction technologies : wet junction and pump down stinger 摘要介绍了湿接头和泵入法两种测井施工工艺的优缺点。 | | 3. | Log practice shows that the methods applications are better , but the wet - connector ' s technical shortcomings need improving 实践证明运用该湿接头水平井测井工艺取得了较好效果,但还需进一步改进其工艺缺陷。 | | 4. | At present , wet - connector logging system that is conveyed by drill pipe is widely used in various highly inclined and horizontal wells 摘要钻杆输送湿接头水平井测井技术是目前在各类大斜度井、水平井测井中运用最成熟的测井技术。 | | 5. | Postgraduate : pu liangtao supervisor : professor shang shouing senior engineer huang gang the research on influence of the post - casting section of continuous rigid bridge suffered vibration of train travelling is preseated in this thesis according to related project . based on theorize analysis , expriments of material properties and members under deformed vibration , verification of isolating and reducing vibration in building as well as construction technology and quality control , the effect of post - casting section suffered deformed vibration is studied thoroughly . through the analysis of 28 tests of shear strength with post - casting section under deformed vibration , the related laws are deduced . and the analysis of finite element method , the studies of quality control and construction technology are also completed 通过现场测试、模型和试块的模拟振动成型试验、加载破坏试验、理论分析、现场减振隔振试验、施工工艺和质量控制等一系列全面、系统的研究工作,认真、深入地研究了现浇混凝土受火车行驶振动的影响,特别是在约束构件后浇湿接头区段内现浇混凝土受火车行驶振动影响研究方面作出了开创性的工作,完成了振动使湿接头区段受到弯曲变形影响条件下的构件模拟振动试验、抗剪强度试验。 | | 6. | As the concrete members are vibrated from 12 to 72 hours , the difference of its strength between vibration members and normal ones is not obvious . the interface of post - casting section is both the most dangerous position of the structure and focal point of quality control . in addition , the leaking of cement paste out of the formwork of vibration member is of no permission 试验表明振动持续时间从12小时到72小时的变化,对混凝土强度没有明显差别;湿接头的界面是最薄弱部位是施工质量控制的重点,振动构件模板应做到务必不漏浆;当振动幅值较大,必须采取隔振、减振措施。 |
- Similar Words:
- "湿搅拌机" Chinese translation, "湿脚气" Chinese translation, "湿接点" Chinese translation, "湿接钢丝" Chinese translation, "湿接合" Chinese translation, "湿接用复合润滑剂" Chinese translation, "湿结核" Chinese translation, "湿结节强度" Chinese translation, "湿界" Chinese translation, "湿介碟" Chinese translation
|
|
|