Mobile
Log In Sign Up
Home > english-chinese > "电力电量平衡" in Chinese

Chinese translation for "电力电量平衡"

electric power and electric energy balancing

Related Translations:
电量分析:  coulometric analysiscoulometry
电力:  [电学] power; electric power◇电力变阻器 power rheostat; 电力捕鱼 electrofishing; 电力潮流 direction of energy; 电力传动 electric drive [transmission]; power drive [transmission]; 电力传动系统 power transmission sy
松弛电力:  electric force of relaxation
连续电力:  continuous power
电力电感:  power inductance
电力行业:  electric powerpower sector
浙江电力:  zhejiang electric power
电力设备:  electric deviceelectric equipmentelectric fixtureelectric installationelectrical equipmentelectrical power unitpower equipment
电力开发:  electric power devel
电力系数:  drag coefficient
Example Sentences:
1.A computer program in turbo - basic is also compiled based on the new method in this paper . pumped storage power plants work flexibly and start very fast
本文按照上述思路,提出了新的电力电量平衡和燃料消耗计算方法,并基于这种方法采用turbo
2.In the end , the decision - making order of scrolling development of cascade hydropower stations is obtained under different power demands by comprehensive analysis
然后运用多种方法进行分析,运用电力电量平衡方法论证开发方案的适应性,通过综合分析得到了不同电力需求下的梯级水电滚动开发决策顺序或者可接受的编序。
3.In big hydropower proportion of power network , the hydropower plan determines the power network operation mode , based on that the hydropower operation mode is definite already , we can be engaged in load generation balance and the power network resources optimized de1ilovment
摘要水电比重较大的电网,其运行方式的安排往往取决于水电计划,在“以水定电”的基础上才能进行电力电量平衡及电网资源的优化配置。
4.By incorporating the power sources location and load prediction results in the energy utilizing proposal , a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made , the result of which indicates that , it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together
并结合区内电源点分布和负荷预测结果,进行了各县三个五年计划期间的电力电量平衡。得到了相应的结论。基于对风能、光能和水能资源开发各自特点的分析,文中进一步对多能互补系统进行了较深入的研究,明确了在阿里地区特定的自然条件下,采用风光互补抽水蓄能开发方式的合理性及可行性。
5.To minimize the impact of the overhaul of power generating , transmission equipments on the safety , stability and economic operation of power gird , this paper , aiming at the overhaul demand of lots of equipments , brings forward the practical optimization method for overhaul planning which can adapt to the dynamic changes of the scale of power grid and integrate the load forecast and the balance of power load and power volume into it , therefore solve the key technical problems encountered by using computer to realize the optimization of overhaul planning
为最大程度减少电网发、输电设备检修对电网安全、稳定、经济运行的影响,针对电网大量设备的检修需求,提出了能适应电网规模动态变化,并与电网负荷预测、电力电量平衡有机结合的实用检修计划优化方法,解决了利用计算机实现检修计划优化的关键技术问题。
Similar Words:
"电力电话投资企业公司" Chinese translation, "电力电价" Chinese translation, "电力电缆" Chinese translation, "电力电缆及连接器" Chinese translation, "电力电缆纸" Chinese translation, "电力电流" Chinese translation, "电力电流续流" Chinese translation, "电力电路" Chinese translation, "电力电瓶双电源机车头" Chinese translation, "电力电容器" Chinese translation