In 1585 a . d . , it was replaced by a wood on bridge with stone piers 此桥六朝时?浮知,由于朝代更叠,到明代才建成石墩木架桥。
2.
Bearing capacity calculation method of composite foundation formed by heavily rammed stone - piers with consideration of lateral deformation 考虑墩体侧向变形的强夯块石墩复合地基承载力计算
3.
Because of deposit the ground form , wide soft soil and large thickness , we should use the methods to set up the standard design . , such as to change and fill out a stone , lump block of stone of the strong rammer and split off the thick liquid of note and so on 摘要深圳市港湾大道沿线属前海湾沿岸海漫滩沉积地貌,软土层分布范围广、厚度大、性状极差,阐述该路采用的换填块石、劈裂注浆、插板排水堆载预压、强夯块石墩等地基处理方法,进行了标准设计。