Mobile
Log In Sign Up
Home > english-chinese > "竖向排水" in Chinese

Chinese translation for "竖向排水"

vertical drainage

Related Translations:
竖接:  vertical joint
直竖:  peak
竖向:  hill and dalehill-and-dalevertical exitverticality
竖向曲:  vertical curve
竖在运动:  vertical motion
竖向涡流:  vertical eddy
整流子竖片:  commutator riser
竖式窑:  shaft kiln
通气竖管:  vent stack
通气竖坑:  downcast
Example Sentences:
1.The pore water pressure difference between silt and pvds ( or sand drains ) increases and the soil consolidation velocity is accelerated during the embankment construction
在路基填筑期间,淤泥地基与竖向排水体之间的孔压差增大,加速土体固结。
2.Some key subjects of numeric analysis were discussed such as : selecting principles of constitutive equations of soft clay , the equivalent theory of vertical drains ground , the definition of load step , the determination of vertical drains as well as the treatment methods of the decline of groundwater level , sealing wall and nearby water source
着重论述了真空预压加固地基数值分析中对土体本构方程的选择、砂井地基等效转换、分析荷载步的确定、竖向排水体的界定、地下水下降的处理、密封帷幕的处理、附近补充水源的处理等问题。
3.Based on the equal strain consolidation model of sand drain , and neglecting the well resistance and the vertical drainage consolidation , a layered model for the nonlinear consolidation of sand drain , which accounts for the geostatic pressure varying along depth and the relationship between the average viod ratio and the logarithm of average effective stress , is presented
摘要基于砂井等应变固结模型,考虑初始有效应力沿深度变化,忽略井阻和竖向排水固结的影响,应用平均孔隙比与平均有效应力的对数关系,建立砂井非线性径向排水固结的分层计算模型,并求得常荷载作用下的径向排水固结解析解。
4.The mechanics of vacuum preloading was discussed by contrast of vacuum preloading and heaped preloading . the factors affecting the result of vacuum preloading for ground consolidation were as follows : the geological conditions of site , the intensity of vacuum pumping , the condition of underground water and installation of vertical drainage line . through analysis of these factors , some conceptions and design principles were proposed for vacuum preloading
在此基础上,通过堆载预压与真空预压的对比阐述了真空预压加固地基机理,分析了影响真空预压加固地基最终加固效果的各个因素:场地地质条件、抽真空作用强度、地下水赋存情况及竖向排水体的设置等。
5.A method to back analysis the distribution pattern of negative pore - water pressure along vertical drainage line was proposed . some practical vacuum preloading projects were analyzed . the results showed that distribution patterns of negative pore - water pressure along the vertical drainage line were uniform and the magnitude was about half of the vacuum degree under the membrane
提出由现场实测资料反分析竖向排水体中的负压分布的方法,通过对若干工程实例的反分析,认为真空预压下负压分布沿竖向排水体的分布基本均布,其值约在膜下真空度的50左右。
Similar Words:
"竖向临曲线" Chinese translation, "竖向流" Chinese translation, "竖向流速曲线" Chinese translation, "竖向录音" Chinese translation, "竖向挠度" Chinese translation, "竖向排水砂井" Chinese translation, "竖向墙板" Chinese translation, "竖向曲" Chinese translation, "竖向曲度" Chinese translation, "竖向缺口" Chinese translation