Mobile
Log In Sign Up
Home > english-chinese > "管涌" in Chinese

Chinese translation for "管涌"

boiling
pipe
piping


Related Translations:
眼泪涌涌:  dash the tears from one's eyes
陈涌:  chen yong
金涌:  jin yong
刘涌:  liu yong
涌山:  yongshan
前驱涌:  fore runnersfore-runners
涌长:  length of swell
涌波:  surfsurge wavewakinamiwakunami
浪涌:  surge; surging; shock◇浪涌能力 surge capacity; 浪涌示波器 surge oscillograph; 浪涌示波术 surge oscillography; 浪涌撞击 surging shock
浪涌调节器:  surge regulator
Example Sentences:
1.The first problem analyzed is seepage piping in embankment , the artificial intelligent model of prediction and judgment for piping is proposed
第一个分析的问题是堤坝管涌问题,应用人工智能技术建立了管涌预测与判定的模型。
2.Moreover , the quantitative relationships among the depths of hanged cut - off wall , the density of foundation soil , and the piping evolution were also derived from tests
并且从试验得到了一些悬挂式防渗墙深度及堤基土密度与管涌发展之间的定量关系。
3.A model test in an organic glass flume with a scale of 1 : 100 was performed to demonstrate the generation and evolution of piping in embankment foundation with different depths of cut - off wall
摘要通过比例为1 : 100的有机玻璃模型槽进行模型试验,模拟二元堤基条件及不同防渗墙深度下,堤基内管涌的发生和发展过程。
4.The area of sediment outflow caused by piping was obtained by photo reproduction , and the local cross - sections of samples after the occurrence of piping were observed and measured with colored sediment taken as tracers
利用拍照还原等方式,得到管涌口出砂面积;并采用彩色砂作为示踪材料,切片观察测量管涌发生后试样的局部剖面。
5.The developed artificial neural network of piping has been trained and predicted by the collected data and the precision of predicted results is high , which proves that artificial neural network is an effective method to predict and judge the occurring of piping
应用收集到的管涌数据对管涌人工神经网络模型进行训练和预测,预测的结果精度较高,说明人工神经网络是预测判定管涌发生的有效方法。
6.A statistic on the piping risks occurred in levee projects in the provinces of hubei , hunan and jiangxi is made herein with the analysis on the distribution of the piping locations and the impacts from the human activities concerned , and then a discussion on the reasonable area of the piping control is made as well
文中对湖北、湖南和江西三省的管涌险情进行了统计,对管涌险情的位置分布特点以及人类活动影响等进行了分析,对管涌抢险的合理范围进行了讨论。
7.The major causes for dyke breaches are the strong permeability of soil at the dyke breaches , resulting in infiltration or piping firstly , and nonuniform settlement on water side and land side of the dyke due to a long - term soakage of the dyke , further leading to cracking and erosion , and finally breaching of the dyke
溃口发生的主要原因是溃口处土壤组成透水性强,先发生散浸或管涌等险情,加上浸沧时间长,迎水面和背水面堤身沉陷不均匀,导致裂缝出现和冲刷的加剧也都促成溃口发生。
8.For example , after the collapse of ditong dam in idaho , may 5 , 1976 , it was found that it was not impervious very well , the impervious curtain was built poorly . when the seepage went through the impervious curtain , the exit water from the pervious material of the downstream or the right side of dam through the foundation or certain line between the foundation and the dam caused contact scour and piping
如美国爱得华州提堂坝于1976年5月5日溃决,事后调查分析,因坝基透水性大,防渗帷幕施工质量差,渗流穿透帷幕,经地基或地基与坝的接触面从坝体下游侧透水料区逸出或从右坝肩绕渗经下游坝体逸出,出逸的水流引起了接触冲刷和管涌,导致溃坝。
9.A mechanics model has been presented to predict and judge the possibility of piping occurring based on the analysis of process of piping occurring and the factors affecting on the occurring of piping . a set of factors which have significant effects on the occurring of piping as well as more easily to be observed and measured have been selected as the input of artificial neural network by the developed mechanism model , and the mapping relation has established between the factors affecting on the occurring of piping and the index of occurring of piping
首先分析了堤坝管涌发生的过程和影响管涌发生的因素,提出了一种预测判定管涌发生可能性的机理模型,根据机理模型从影响堤坝管涌发生的诸多复杂因素中选出既便于测量、观测又对管涌发生影响显着的几种因素作为人工神经网络的输入,建立了管涌影响因素与管涌发生指标之间的映射关系。
10.Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying , design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no . 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying , design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength , stability and thermal control problem for xi - luo - du project
溪洛渡水电站超大型地下洞室群围岩稳定的安全可靠性分析:被成都勘测设计研究院应用于比选报告及可行性论证中; ( 2 )小关子水电站拦河闸坝及地基的应力应变分析:被成都勘测设计研究院应用于地基加固处理方案; ( 3 )三峡厂房7 # - 14 #坝段温控并缝措施研究:为厂房坝段并缝方案的可行性提供了依据; ( 4 )堤防工程体系的长期监控预报预警决策系统开发:为监控、预测预报堤防渗漏管涌破坏提供分析软件; ( 5 )向家坝地下洞室群围岩稳定的安全可靠性分析:被中南勘测设计研究院应用于初步设计方案中; ( 6 )靠船墩的疲劳可靠度研究:为广东航运规划设计院的靠船墩优化设计和加固提供依据; ( 7 )溪洛渡高拱坝坝体坝基(坝肩)强度和稳定的三维静动力随机有限元分析及可靠度计算:为溪洛渡重大工程坝体的静动力安全稳定性及温控方案提供依据。
Similar Words:
"管移位x线摄影,立体x线摄影" Chinese translation, "管艺" Chinese translation, "管益忻" Chinese translation, "管翼贤" Chinese translation, "管缨虫属" Chinese translation, "管涌比" Chinese translation, "管涌力学" Chinese translation, "管涌破坏" Chinese translation, "管涌侵蚀" Chinese translation, "管涌现象" Chinese translation