| 1. | Genetic - algorithms - based assembly line balancing 基于遗传算法的装配线平衡 |
| 2. | Ga - sa based mixed - model u - shaped assembly line balancing 基于分支定界方法的双边装配线平衡 |
| 3. | Method for engine assembly line balancing 装配线平衡系统研究与开发 |
| 4. | Combined u - shaped assembly line balancing 发动机装配线平衡方法研究 |
| 5. | The methods for solving the problem of balancing an assembly line 装配线平衡问题的求解方法浅析 |
| 6. | Mixed - model assembly line balancing design 型装配线平衡 |
| 7. | Hybrid genetic algorithm for solving the problem of balancing an assembly line 求解装配线平衡问题的混合遗传算法 |
| 8. | Large - scale assembly line balancing optimization with complex task constraints 大规模带复杂任务约束的装配线平衡问题优化 |
| 9. | Appication of genetic algorithm based on task sequences to assembly line balancing 用基于作业序列的遗传算法求解装配线平衡问题 |
| 10. | Different from traditional problem of balancing one - side assembly line , for two - sided assembly line balancing problem , nut only the precedence constraints among tasks but also the operation directions of tasks and the requirement of parallel work should be taken into consideration 摘要与传统的单边装配线平衡问题不同,双边装配线平衡不仅要考虑任务优先顺序关系,而且要考虑任务操作方位以及双边并行作业的要求。 |