Mobile
Log In Sign Up
Home > english-chinese > "边柱" in Chinese

Chinese translation for "边柱"

edge column
marginal note
side column
side pillar
side post
Example Sentences:
1.Punching capacity of slab - column edge connections
板柱结构边柱节点的受冲切承载力
2.Guard frame lower gusset plate
边柱下角板
3.Guard fame upper side stopper
边柱上挡
4.Guard frame ouside post
货架边柱
5.Embedded columns can increase shear strength as well as control of displacement and failure
配以暗框边柱能提高剪力墙的抗剪强度、位移控制和破坏控制能力。
6.The effect of initial static load on the instantaneous response is related to the stiffness , mass and damp
在对底层边柱突然失效的高层结构进行分析时,必须计算结构的瞬时动力响应。
7.The finite element method is used to simulate the instantaneous response of a high - rise building with a sudden invalidation of side columns of the ground floor
摘要为研究高层建筑结构整体性问题中连续倒塌问题,采用有限元方法模拟高层结构底层边柱突然失效时的瞬时动力响应。
8.On the field construction of storage tank , the hoisting structure of electric block , by means of mechanics analysis and computation , can determine the amount which the electric block requires , the size of its side column and central column and its connecting forms , thus eventually reasonably allocating construction tools and decreasing the consumption of assistant materials only when the construction security is guaranteed
摘要储罐现场施工中,电动葫芦提升结构可通过力学分析、计算,确定所需电动葫芦的数目、提升组合结构中边柱和中心柱的规格尺寸及其连接形式,达到在保障施工安全的前提下合理配置施工机具、减少辅助材料消耗的目的。
9.For meeting the related nantional standards and avoiding demolishment of the building , the underpinning and strengthening methods are used , with which the loads of center column are underpined by the diagonal steel strut and the cross - sectional areas of side pillar are strengthened , both ends of shear wall are chiseled in turn and then concrete is poured again
通过采用斜向钢支撑荷载转移法实现对中柱的托换,采用剪力墙两端分批凿除后再浇捣实现对剪力墙的托换,采用增加截面法对边柱进行加固,使建筑物经托换和加固后能满足国家有关规范的要求。
10.This thesis aims to analyze how to select and assign prestressed tendon , how to design anchorage bearing joint , how to control the crack , how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer . on the base of the research in and out our country and construction of the prestressed structure , some helpful conclusion and suggestion are presented , which is suggestive for the design and construction of long span continuous prestressed concrete frame
本文将综合设计与施工两个方面,对预应力筋的选用、布置,锚固区的设计及构造处理,裂缝问题,侧向约束对梁轴向预压应力及柱中第三弯矩的影响,顶层大跨边柱设计等几个问题进行系统的分析研究,并在国内外研究和大量工程实践的基础上,提出了一些建议和预防措施,对此类工程设计和施工有一定的参考价值。
Similar Words:
"边重组交" Chinese translation, "边重组交叉" Chinese translation, "边轴" Chinese translation, "边轴外旋转门式窗" Chinese translation, "边肘板" Chinese translation, "边柱和过梁" Chinese translation, "边柱上挡" Chinese translation, "边柱下角板" Chinese translation, "边注" Chinese translation, "边转仪器" Chinese translation