Mobile
Log In Sign Up
Home > english-chinese > "进水温度" in Chinese

Chinese translation for "进水温度"

entering water temperature
water inlet temperature


Related Translations:
进水总管:  intake mainwater inlet manifold
进水速率:  intake rate
进水量:  flooding quantityinflowwater intake
进水软管:  water supply hose
递增进水:  progressive flooding
进水管线:  intake pipe line
进水通道:  access gallery
锅炉进水:  boiler feed water
进水空间:  inlet plenum
进水建筑物:  intake constructionintake structureintake works
Example Sentences:
1.In winter , because the water temperature descend and the activity of microbial reduce
冬季由于进水温度的下降,微生物活性的降低,处理效果明显下降。
2.4 . the temperature of infall cooling water is less than 30 , the velocity of cooling water flow should be over 4l min for capacitor below 1000kvar and it should be over 6l min for capacitor over 1000 kvar
4 .冷却水的进水温度不超过30 ,冷却水的流速对1000kvar及以下的电容器不低于4l min ,对1000kvar以上的电容器不低于6l min 。
3.For a soil or rock of water - lacked , a heat transfer theoretical model is developed , which is a steady or unsteady , the results show that reservoir temperature , thermal diffusion coefficient , inlet temperature , flow rate of and run time of ground source heat pumps have an effect directly on heat transfer process of dhe . it can deduce that intermit running is favorable for this type of soils and rocks
对于贫含水地下岩土层建立了稳态与非稳态传热的理论模型,分析结果表明,岩土层的热储温度、导温系数、埋地换热器进水温度、流量以及地源热泵系统的运行时间或开停机比,都对埋地换热器的传热过程产生直接影响,可以推断,对于该类型岩土层的地源热泵系统,采用间歇运行将是有利的。
4.The main research contents are as follows : 1 . build a steady - state simulation model of a general heat pump system , calculate system performances of using r22 and ( 30 / 70wt % ) r32 / r134a as refrigerants respectively , and get their performance curves as the working conditions change
主要研究内容如下: 1建立了常规热泵系统的稳态仿真模型,对采用r22和( 30 70wt ) r32 r134a为制冷工质的系统分别进行了计算,得出其各自性能随蒸发器进风或冷凝器进水温度变化的关系。
5.Thirdly , radiator performance test - bed thermal system control modeling and rule self - organizing fuzzy control simulation were studied . the water supply temperature , radiator inlet temperature , test room temperature based on water temperature regulation , air supply average temperature and test room temperature based on air temperature regulation total five controlled processes transfer function were set . finally , rule self - organizing fuzzy control simulation for two
通过试验,辨识了散热器实验台热工系统中供水温度、散热器进水温度、基于热水系统调节的测试室温度、送风平均温度及基于送风系统调节的测试室温度共5个被控过程的传递函数,并对基于热水系统调节和基于送风系统调节的测试室温度响应过程进行了规则自组织模糊控制仿真。
6.Through developing a 2 - dimensions heat transfer model of buried pipe - in - pipe heat exchanger and simulating the process by computer , the author figures out inter - relations of factors which influence characteristics of buried pipe - in - pipe heat exchanger , such as pipe diameter , pipe length , ratio of pipe diameters , flow rate , inlet water temperature , patterns of water inlet and outlet , and material features made of pipe , and proposes some optimizing indexes of buried pipe - in - pipe heat exchanger . the author studies the " heat - - short circuit " phenomenon as well and gives < wp = 5 > some important results
本文通过建立地下套管式埋管换热器传热过程的二维传热模型,并借助计算机对分析结果进行解析,弄清了影响埋管换热器性能的管径、管长、管径比、通过流量、进水温度、进出水方式以及管材等参数的作用,并提出了相应的优化指标,对研究界悬而未决的“热短路”问题也进行了细致分析,得出了有关结论。
7.By using the finite element numerical simulating method , and studies based on the practical project xiluodu arch dam , this paper studies systematically the type of joints , placing temperature , protection methods on the surface of concrete dams , the first stage artificial cooling method including different cooling water temperatures , cooling lasting days and cooling pipes arrangement
本文利用数值仿真计算方法,以溪洛渡实际工程为依托,对大体积混凝土施工中常采用的温控措施对混凝土温度变化的影响规律进行了全面系统的研究,包括分缝分块方式、浇筑温度、混凝土间歇时间、一期冷却方式(包括不同进水温度、不同水管布置、不同通水时间)等。
Similar Words:
"进水塘" Chinese translation, "进水通道" Chinese translation, "进水弯管" Chinese translation, "进水湾;进水口" Chinese translation, "进水位" Chinese translation, "进水线" Chinese translation, "进水箱" Chinese translation, "进水旋塞" Chinese translation, "进水选择器" Chinese translation, "进水循环" Chinese translation