| 1. | Psi 327 . pick up test mandril and place in bop 吊起试压防喷器芯子并装入防喷器组 |
| 2. | Stack the risers on the rack with the bop crane 防喷器吊车将隔水管排入管架内。 |
| 3. | Lift bop stack and replace wellhead connector ax ring 吊起防喷器组并更换连接器 |
| 4. | Blowout preventer and control system blowout preventer 防喷器及控制装置.防喷器 |
| 5. | Put the risers in proper position with the crane 用防喷器吊车吊放好隔水管。 |
| 6. | Control system for surface mounted bop stacks 地面防喷器及控制装置控制装置 |
| 7. | When the bit goes through the bop , slow down , please 当钻头通过防喷器时,慢一点放。 |
| 8. | Move the bop crane to the end and secure it with screws 防喷吊移到顶端并用螺丝固定。 |
| 9. | Have bop ram opened up for internal inspection 打开防喷器闸板进行内部检查 |
| 10. | We do not use this valve to control the blowout preventer 我们不用这个凡尔控制防喷器 |