Mobile
Log In Sign Up
Home > english-chinese > "防止装置" in Chinese

Chinese translation for "防止装置"

arrester

Related Translations:
防止收缩:  shrinkage prevention
防止核战争:  prevention of nuclear war
防止行动:  preventative action
防止延迟:  avoidance of delay
防止意外:  accidentproofprevention of accidents
防止大气污染:  air conservation
防止水污染:  water conservationwaterco ervation
防止浪费:  avoid waste
防止串味:  to avoid tainting
防止问题:  prevent problem
Example Sentences:
1.Bspc , block system emergency preventive controller
制御事故波及防止装置东北
2.Unpleasant smell prevention device no . 2977549
恶臭防止装置第2977549
3.Cas , collision avoidance system
冲突防止装置
4.It is anticipated that this paper would have some referential value to the design , application and production of falling - off prevention device , in order to accelerate its process of the practicality
希望本论文的研究成果将对落梁防止系统的设计、应用和生产具有一定的现实参考价值,以加速落梁防止装置的实用化进程。
5.Based on the analysis of the highway bridges " damages in the earthquakes of recently twenty years and the introduction of the development and the present technology of the world , the paper has explored a useful falling - off prevention device
本论文在分析近20年来桥梁震害及其原因和介绍国内外防止落梁技术的发展和现状的基础上,开发了有效的落梁防止装置
6.In this paper , the three level fortification criterion , two stage design method and the elastic response spectrum theory are adopted , and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate . through gathering , analyzing and calculating a lot of bridge design materials , this paper induces a simple way to calculate the relative displacement of the beam and the pier , and then according to the current design method , it concludes a better design principle of the supporting length of the beams . at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges
本论文采用三水准设防、两阶段设计方法、弹性反应谱计算理论,运用桥梁结构非线性地震响应分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )进行计算;通过收集大量的实桥设计资料,经分析计算,归纳总结出计算上下部结构相对位移的简便计算方法;并综合国内外的经验值,提出梁的支承长度se的设计原则;同时运用动力学突加荷载的原理,推导分析了预应力钢绞线式(钢棒连接式)落梁防止装置设计承载力的计算方法和设计伸长量s _ f的取值;最后本文通过实桥计算,说明了落梁防止系统设计的方法。
Similar Words:
"防止重复曝光装置" Chinese translation, "防止重合线路" Chinese translation, "防止重拍机构" Chinese translation, "防止蛀牙" Chinese translation, "防止注入式攻击" Chinese translation, "防止资助恐怖主义行动局" Chinese translation, "防止滋长骄傲自满情绪" Chinese translation, "防止自然分级;混匀" Chinese translation, "防止自燃阀" Chinese translation, "防止自身交叉" Chinese translation