| 1. | Forecast and treatment of rock - burst in tunnel construction 永乐电站引水隧洞施工岩爆预测及防治 |
| 2. | Construction management of hongjiadu hydropower station project 拉西瓦水电站前期隧洞施工进度风险分析 |
| 3. | Goal model on system reform of the urban public healthcare facilities in china 引水隧洞施工中遇不良地质段的处理措施 |
| 4. | The application of natm to guan yin shan tunnel construction in dongjian - shenzhen supply modification works 深圳供水改造工程观音山隧洞施工中的应用 |
| 5. | Study on foundation treatment of dashahe siphon for water diversion project from biliuhe reservoir to dalian city 在大连市引碧玉皇庙隧洞施工中的应用 |
| 6. | Fenggang tunnel construction technology for dongjiang - shenzheng water supply modification engineering in guangdong province 深圳供水改造工程凤岗隧洞施工技术 |
| 7. | For some tunnel ' s construction , the stability of surrounding rock shoring mode , shoring time and so on have been studied 对地下隧洞施工过程中围岩的稳定性以及支护方式和支护时机等问题进行了研究。 |
| 8. | For some underground chamber construction , the stability of surrounding rock different excavation method and so on have been studied 对沙湾隧洞施工过程中围岩的稳定性以及不同开挖方式等问题进行了研究。 |
| 9. | The high geotectonic stress at the construction region and the activity subsurface water will have important effects on construction and operation 隧洞施工穿越高地应力区,且施工区活跃的地下水对隧洞施工及日后的安全运行有着重要的影响。 |
| 10. | The main methods for the construction of tunnel are usually both the traditional drilling and blasting method and the modem method of tbm , which have their own applicable conditions concerned 摘要隧洞施工的主要施工方法是传统的钻爆法和现代的掘进机法,各个方法均有其不同的适用条件。 |