Mobile
Log In Sign Up
Home > english-chinese > "集水面" in Chinese

Chinese translation for "集水面"

[ jíshuǐmiàn ]
catchment area (basin)

Related Translations:
水面:  the surface of the water; table◇水面操纵 surface manoeuvering; 水面导航 surface navigation; 水面发射 water-surface launching; 水面航空跑道 overwater airport runway; 水面滑行 hydroplaning; 水面减压 surface decompres
水面世界:  between air and water
拍打水面:  paddle
潮汐水面:  tidal watertidewater
水面蒸发:  evaporation form water surfaceevaporation from water surfaceevaporation of water surfacewater surface evaporation
水面上升:  water surface ascentwater-table rise
水面平台:  surface platform
测压管水面:  piezometric surfacepotentiometric surface
水面的:  surface
水面浮标:  surface buoywater surface float
Example Sentences:
1.With the same slope gradient and slope length , the soil erosion on the dyke slope caused by the runoff mainly depended on the factors such as the runoff , flow velocity , rainfall intensity , rainfall duration , as well as the up - slope drainage area of dyke slope
坡度、坡长一定时,径流对戗坡的侵蚀主要与径流量、流速、雨强、降雨历时,戗坡以上汇聚水量或集水面积有关。
2.The system considers synthetically the influence of estuarine ecosystem on the whole basin and human life from aspects of influence on pacts of the environment , biology and human of ecosystem respectively , and adopts the indices of catchment area , population density , inflow amount , period of river flow cut - off , water quality , biodiversity index number and biomass to evaluate the state of estuarine ecosystem
指标体系综合考虑河口生态系统对全流域及入类生活的影响,分别从生态系统的环境部分、生物部分以及对人类的影响等3方面,采用集水面积、人口密度、入海量、河口断流时间、水质、生物多样性指数和生物量等7项指标对河口生态系统状况进行评价。
3.When catchment area , average channel gradient and catchment shape factor of designed culvert or bridge are known , a user can be convenient to get local parameters c , e and b from standard contour charts and easy to calculate flood flow just by a calculator . design period of flood flow is enormously shortened as well as a high precision . estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods , so that much cost is cut down a s reducing the span of culvert or small bridge
以75000km ~ 2的川中丘陵地区为试点研究区,绘制了该地区新模型的参数等值线图,率定了不同设计频率的改正系数,使设计者只需在地形图上获取集水面积,河道平均坡降和流域形状系数,在参数等值线图上查得桥涵所在地的相应参数,使用计算器即可迅速计算出设计流量,大大缩短了设计周期,且精度较高,设计的洪水流量一般低于传统方法,从而可减小桥涵跨径,节省投资。
4.There are four characteristics of the evolution of tidal creek as follows : ( 1 ) in the initial stages , tidal creek develops by continuous eroding trace to the source and depriving of the top of other tidal creeks . ( 2 ) the transverse moving of tidal creek occur mostly in the lower part , the middle part and the outlet take second place , and the upper part is more stability . ( 3 ) the different level branches of tidal creek transform into each other in the whole evolution course
潮沟的演变具有以下特点: ( 1 )潮沟在形成初期,不断进行溯源侵蚀和袭夺以扩大集水面积而发展壮大, ( 2 )潮沟的侧向移动主要发生在潮沟的下段,中段和口门次之,上段最为稳定( 3 )不同级别的支潮沟之间处在不断地相互转化过程之中。
Similar Words:
"集水联箱" Chinese translation, "集水量" Chinese translation, "集水硫" Chinese translation, "集水流域" Chinese translation, "集水盲沟" Chinese translation, "集水面积" Chinese translation, "集水面积(区)" Chinese translation, "集水排水沟" Chinese translation, "集水盘托架" Chinese translation, "集水喷射装置" Chinese translation