| 1. | The plane rotation slope on the right shoulder of heihe reservoir dam 黑河水库右坝肩平面旋转坡体 |
| 2. | A study on assessment of soil erosion in area of heihe river basin 黑河水库汇流区土壤侵蚀评判方法研究 |
| 3. | Basic features and ecological protection countermeasures of heihe reservoir ' s confluent region 黑河水库汇流区的基本特征与生态保护对策 |
| 4. | The heihe river project ' s excavation volume is huge from the original wing wall design for the right - hank spillway tunnel , which increased investment 摘要黑河水利枢纽在设计与施工过程中基础开挖量较大,增加了工程投资。 |
| 5. | The excavation of the right slope of the approach channel for the inlet of the spillway tunnel in heihe water control project has a significant effect upon the construction quality and the cost of the project 摘要黑河水利枢纽右岸溢洪洞进口引渠右岸边坡的开挖方案,是影响该工程质量和造价的突出问题。 |
| 6. | The control area of the wei river basin is rather large with diverse climate feature ; the suitable hydrological forecasting models for feng - jia - shan and hei - he reservoirs are studied and applied in practice 针对渭河流域面积大,气候差异大的特点,分析研究了冯家山、黑河水库适用的水文预报模型,并进行了预报研究。 |
| 7. | The statistical work in the heihe project construction is conducted by using the computer system with the real time input data . the construction information can be collected , stated , and searched for analysis and for the use of decision maker 黑河水利枢纽工程的施工统计采用计算机系统,施工的各种数据输入计算机,可随时进行统计、汇总,供检索分析和领导决策使用。 |
| 8. | Abstract : the statistical work in the heihe project construction is conducted by using the computer system with the real time input data . the construction information can be collected , stated , and searched for analysis and for the use of decision maker 文摘:黑河水利枢纽工程的施工统计采用计算机系统,施工的各种数据输入计算机,可随时进行统计、汇总,供检索分析和领导决策使用。 |
| 9. | Through comprehensive analysis of monitoring results of water quality of huang river , da hei river system and hui river system over ten years , the change tendency is exposed , and the problems in each river pollution section which are urgent to be resolved are put forward 摘要对黄河(过境) 、大黑河水系及浑河水系十年水质检测结果进行综合分析,揭示其变化趋势,并针对各河流污染断面提出急需解决的问题。 |
| 10. | Clustering figure shows that , along the route groundwater seepage , the melt water first recharges groundwater of nuoertu , then that of gurinai and guaizi lake ; the long clustering distances of groundwater samples of gurinai and guaizi lake perhaps result from infiltration of the heihe river ; it ' s impossible that water of heihe river recharges underwater of the badain jaran desert represented by nuoertu 由聚类图推测:祁连山冰川融水通过地下首先经过诺尔图,然后到达古日乃和拐子湖;古日乃和拐子湖地下水某些样品聚合距离大,可能是由黑河水渗入引起的,少量黑河水可通过古日乃渗入拐子湖引起地下水成分变化;没有迹象显示黑河水补给巴丹吉林沙漠(以诺尔图为代表)地下水。 |