Mobile
Log In Sign Up
Home > english-chinese > "龙沟" in Chinese

Chinese translation for "龙沟"

hot metal runner
iron runner


Related Translations:
:  名词1.(挖掘的水道或工事) channel; ditch; gutter; trench 短语和例子交通沟 communication trench; 排水沟 drainage ditch; drain; 阴沟 drain; sewer; 挖一道沟 dig a ditch; 沟里的水不很清洁。 the water in the ditch is not very clea
Example Sentences:
1.The extraction of mineralized and altered rock information from remote sensing image based on svm
东昆仑五龙沟金矿围岩蚀变的遥感识别
2.However , there are joints without any tectonites at the end of the two main faults
而乌龙沟断裂南端和紫荆关断裂北端是缺少碎裂岩带的节理带。
3.Minerogenetic mechanism and condition of wulong gou gold deposit in east kunlun mountains , qinghai province
青海东昆仑五龙沟金矿床成矿条件及成矿机理
4.Chengdu to the kalong ditch 310 kilometers , the kalong ditch to amounts to the ancient glacier 112 kilometers
成都至卡龙沟310公里,卡龙沟至达古冰川112公里。
5.51 long vacations period , has gone to the kalong ditch , unfortunatelyis precisely the off season time . but is off season here also is the same beauty
五一长假期间,去了卡龙沟,不巧的正是淡季时期。不过就算是淡季这里也是一样的美丽。
6.And reaches the ancient glacier state of roads from chengdu to the kalong ditch scenic are a extremely to be all good , to scenic are a in for pitch / cement road surface
从成都至卡龙沟景区及达古冰川路况都非常好,到景区内均为柏油/水泥路面。
7.First introduces its geographical position : the kalong ditch scenicarea is located with in the boundaries of the heishui county kalong town , average elevation 3 , 544 meters
先介绍一下它的地理位置:卡龙沟景区位于黑水县卡龙镇境内,平均海拔3544米。
8.Lastly according to the result of analysis and combining to the instance that the goaf extend practically , the author makes an evaluation to engineering suitability of the first and second tunnels of of wu long channel on coal mine railway leased line in da ning of shanxi province , which is to be built in the future
最后根据上述分析结果并结合采空区的实际分布情况对拟建的山西大宁煤矿铁路专用线五龙沟1 ~ # 、 2 ~ #隧道的工程适宜性作出评价。
9.Zijingguan fault zone is the main structure in taihang mountains that are located in the central part of 20 ~ 30 ne - striking daxing ' anling - taihan - wuling tectonic belt . it is composed of two diagonalized faults that are wulonggou - shanghuangqi fault located in the west and zijingguan - lishan fault in the east
紫荆关断裂带是大兴安岭?太行山?武陵山构造带中段太行山地区的主体构造,总体走向20 30 ,由西侧的乌龙沟?上黄旗断裂和东侧的紫荆关?灵山断裂左阶斜列组成。
10.Based on the investingation and some study methods of the stability on the goaf , the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example , according to the engineering geological invesitigation and maping in the earth ' s surface , also combining the visit on the relate people , firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ) , and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling , it make clear that the results which tested by sws is reasonable and believable , based on finding out clearly the space extend of the goaf , the author makes a relatively systemic study on the stability of wall rock around the goaf
因此,查明采空区的具体位置,在此基础上对场地进行工程适宜性评价,对整个工程建设具有重要的指导意义。本论文在总结前人对地下采空区勘察及有关稳定性研究方法的基础上,以山西大宁煤矿铁路专用线五龙沟1 ~ # 、 2 ~ #隧道采空区为研究实例,在详细的地表工程地质调查和测绘的基础上,结合通过对采空区有关人员的探访,首先对主要开采矿层的空间展布进行地质判断;然后采用国内外较为先进的工程勘探与检测仪(简称“面波仪” ) ,对1 ~ # 、 2 ~ #隧道中线两侧一定范围内(共40米)进行了面波测试,对采空区的可能出露部位进行了较为准确的判断;最后通过钻探加以验证,表明面波仪的测试结果是较为合理可信的。
Similar Words:
"龙宫探宝" Chinese translation, "龙宫翁戎螺" Chinese translation, "龙宫仙子" Chinese translation, "龙宫戆驸马" Chinese translation, "龙汞" Chinese translation, "龙鼓上滩" Chinese translation, "龙鼓水道" Chinese translation, "龙鼓滩" Chinese translation, "龙鼓滩发电厂" Chinese translation, "龙鼓洲" Chinese translation