Problems for outsize water tank of sewage disposal station during the course of construction supervision 污水处理站特大水池施工监理过程中的问题
2.
The power supply is sufficient with the installed capacity of 2315kva and the installed evaporative duty is 20t h 时,电力满足供应,企业现建污水处理站一座,日处理量为
3.
This paper reports the quality indexes inspection of the treated waste water at the campus of dalian institute of light industry 摘要对大连轻工业学院校内污水处理站的处理出水进行了检测分析。