| 1. | A site designed for flow must appeal to new users and power users alike 土地,设计流量必须呼吁新用户和电力用户的乐趣。 |
| 2. | The first step in designing for flow is to set clear goals for your users 第一步,在设计流量是确定明确的目标,为你的用户。 |
| 3. | Designing for flow requires an enlargement of empathy and a deepening of emotional and intellectual subtlety 设计流量需要一个扩大的同理心和加深了情感和智力微妙。 |
| 4. | Based on the hydraulic calculation model of pipe networks , a mathematical model of loop optimization is developed , which can make the optimal regulation of pipe networks to satisfy the design discharge of chilled water for all users 摘要本文在管网水力计算模型的基础上,建立回路优化的数学模型,可以对管网进行优化调节,以使所有用户的水流量达到设计流量。 |
| 5. | Despite the challenges , the rewards of designing for flow are a user base that is loyal and enthusiastic ? one that will evangelize your site to others ? and a more profound sense of engagement between you and the people for whom you design 尽管面临挑战,奖励的设计流量是一个客户群,是忠诚和热心人表示,将在教化你的网站,以他人和更深刻的意义上的接触,你和那些人,你的设计。 |
| 6. | Although the canal conduit capacity does not change very much than design discharge , the canal erosion due to many years scour already damaged the canal stability . therefore , taking efficient measures should protect the canal 然而对于北部引嫩渠道来说,尽管大部分渠道在设计流量下输水能力并没有什么明显的损失,但渠道的横向坍塌拓宽已危及堤岸的安全,应及时采取防治措施加以治理。 |
| 7. | The paper makes quantification about the two important factors influencing the design flow - - frequency of fixture use p and water supply reliability p . the paper presents that water supply reliability does not make marked influence . so it is important to get a proper value frequency of fixture use 本文分别对影响给水设计秒流量的两个最重要因素? ?卫生器具使用概率p和给水保证率p _ r ,进行了量化分析,提出给水保证率对设计流量的影响程度不显著。 |
| 8. | Combining with practical investigation and analysis , the author presented the fitting equation of the second non - uniform coefficient in which the method of least squares error approximation with the power index regression is used and proposed a modified formula for flow rate per second calculation to precisely determine the size of pipeline and to make the design advanced in technology and reasonable cost 本课题分析了室外和室内的设计流量公式,通过调查、实测本地区的水量资料,运用相关数学方法分析,提出了适合小区给水管网采用的流量公式。 |
| 9. | For example , when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s , the actual flow quantity is 23 . 8m3 / s on the 30th of september in 1989 , the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4 . 3m , and the level between downstream and shang tian yuan tunnel was generally higher . it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value . this not only make the benefit of the irrigation district abnormal , but also greatly hinder the economic development of the irrigation district , and lead to the canal run frequently at small flow , high water level , lengthen the discharge duration 如东一干渠上段太平桥以上设计流量45m ~ 3 s , 1989年9月30日实测通水流量23 . 8m ~ 3 s时,东一干渠郝湾渡槽出口渐变段末端水位已达到设计水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即东一干渠上段目前仅能通过流量24m ~ 3 s左右,只有设计值的50左右,不仅使灌区效益得不到正常发挥,严重阻碍了灌区范围内的经济发展,而且使渠道经常处于小流量、高水位运行,延长了次通水时间,大大增加了渠道工程的安全管理难度。 |
| 10. | As cleaning always involves only a small part of the filtration area , i . e . only a small number of filter candles are cleaned at any time , back - flushing is very fast and highly effective . filtration is not interrupted during the back - flushing process . the only moving parts are the back - flushing arm and the flow control device ; their plastic bushings re - adjust automatically and therefore wear and maintenance costs are extremely low 反冲洗耗水量少:本机反冲时同一时间只清洗一到两只滤芯,占整个滤芯数量的十几到二十几分之一,所以排污耗水量小于设计流量的5 % ,反冲洗可自动定时差压手动切换,可编程序控制器plc控制。 |