Mobile
Log In Sign Up
Home > chinese-english > "金江" in English

English translation for "金江"

jinjiang
kanae
kanee
kanegae
kim giang


Related Translations:
:  名词1.(大河) (large) river 短语和例子在江心 in the middle of a river; 鸭绿江上有一座钢铁大桥。 a steel railway bridge spans the yalu river.2.(指长江) the changjiang [yangtze] river 短语和例子大江东去。 eastward flows the chan
满江江:  imbricate mosquito fern herb
Example Sentences:
1.Mr . matthew cheung kin - chung
金江先生
2.Mr stephen kk fong
金江先生
3.Timeline is an earlier work of jin jiangbo , a world - famous installation artist of new media
《时间轴》是国际知名的新媒体装置艺术家金江波较早的作品。
4.Located in the business centre of the eastern part of the city , the hangzhou wan hotel hangzhouwan dajiudian is close to the eastern railway station , the eastern bus station and the airport
杭州湾大酒店是一家国际三星级旅游涉外饭店,位于杭州大都市中心城区金江干,距机场火车站市中心仅十几分钟车程。
5.The new media art exhibition of qiu zhijie and jin jiangbo is held against this academic paradigm shift with a new type of art planning to respect the cultural authority of the general public and to stimulate more interactions with the viewers ,
邱志杰金江波新媒体艺术展就是在这样的学术背景下应运而生的、以尊重公众文化权力为原则、加强观众互动为方式的一次新型艺术策划的尝试。
6.According to composition and structure feature of jinjiang landslide analysis , the author considers it was a enormous landslide with the characters about multi - period ( total four slides ) and overlaying , its mechanism of deformation failure attributed to a representative sliding - bending mode in the consequent slope , the stability calculation indicates that no matter what the whole landslide would not slide , while , as earthquake intensity reaching or exceeding vi , the first - period landslide which lies to the south of huangjiagou in the front slip mass and the fourth - period landslide which lies to the north of caojialiangzi in the back slip mass will slide
金江滑坡的组成及结构特征分析可知,边坡为一多期次(四次滑动)兼具超覆特征的巨型滑坡,其变形破坏机制属顺层边坡中比较典型的滑移?弯曲型。稳定性计算表明,滑坡整体稳定性较好,仅在遭遇度及其以上地震作用的情况下,堆积体前部靠黄家沟以南的第一期滑坡及靠后部北侧曹家梁子的第四期滑坡堆积体才会失稳;因素敏感性分析表明,滑坡稳定性对地震(尤以强震)最为敏感。
7.On the basis of the result of the research on the landslide damming of river , failure of landslide dam , outburst flood and landslide surge , the failure of the part of landslide will arise a maximum surge height to 6m at the dam site , at the same time , the height of landslide dam will reach possibly 33m , and the flood peak of outburst flood will reach 15841 ~ 7613m3 / s , and make water level to rise at 11 ~ 4m through jinjiang to xiluodu of the jinsha river
堵江溃坝及涌浪研究结果表明,局部的边坡失稳在坝址处引起的涌浪高达6m ,并可能形成高约33m的滑坡堵江坝,溃决洪水将在金江至溪洛渡河段形成15841 7613m ~ 3 / s的洪峰流量,使得此段江水位上涨11 4m 。
8.The jinjiang landslide , which is away 5km from the left bank of upper stream of baihetan hydropower station in the jinsha river , with about 1 . 58 108m3 of accumulation and 56m of average thickness , is very huge ; so that , evaluating the stability of landslide and forecasting its danger are also particularly important to assess the possibility of the project
金江滑坡距拟建的金沙江白鹤滩巨型水电站左岸上游仅5km ,其堆积体积近1 . 58 10 ~ 8m ~ 3 、平均厚度达56m ,因此,弄清其稳定性状况及合理地预测其危害对评价工程建设的适宜性显得尤其重要。
Similar Words:
"金建" English translation, "金建华" English translation, "金建模" English translation, "金建中" English translation, "金将" English translation, "金江根" English translation, "金江焕" English translation, "金江军" English translation, "金江燃气公司" English translation, "金江湍蛙" English translation