| 1. | If it does meet those standards, it can then use the name and advertising symbol, the logo, as it is called, for the group . 验收合格,方可使用此名称和广告标志,即所谓标识。 |
| 2. | Aql acceptable quality level 验收合格标准 |
| 3. | After testified to be qualified , the project can only be transferred to client to use 本工程竣工并验收合格后,才能交付发包人使用。 |
| 4. | After testing of six months , ccdwas has been confirmed to be qualified already at present 该系统经三个月运行测试,功能正常,目前已被本钢炼钢厂验收合格。 |
| 5. | Housing project guarantees period the computation since the day that checks and accept qualification from project complete 房屋建筑工程保修期从工程竣工验收合格之日起计算。 |
| 6. | The free technical service period is 12 months , which will be calculated from the date that tested to be qualified 免费调试技术服务期为12个月,自本工程验收合格之日起开始计算。 |
| 7. | Highways that have not been checked in accordance with relevant state regulations before acceptance , should not be made available for use 末按国家有关规定验收合格的公路,不得交付使用。 |
| 8. | Upon the acceptance of the goods by a third party , party b shall pay to party a the 70 % balance within 10 days of such acceptance 该货物经过第三方验收合格后,乙方应在十日内向甲方付余款的70 % 。 |
| 9. | The system referred above has been installed / tested / verified for acceptance ( please attach the main qualified technical specification ) 上述系统已安装/测试/通过验收(请另附上验收合格的主要技术指标) 。 |
| 10. | After checking and up to the grade , the buyer receive the goods and affix his signature or stamp his unit seal on the seller ' s delivery order 验收合格后,需方收取货物并在供方出货单上签字或加盖单位印章。 |