Mobile
Log In Sign Up
Home > chinese-english > "验收合格证" in English

English translation for "验收合格证"

acceptance certificate
certificate of acceptance


Related Translations:
管理会计合格证书:  certificate in management accounting
验收:  check and accept; check before acceptance; check upon delivery; acceptance check; control reception 短语和例子逐项验收 check item by item before acceptance; 验收单 receipt; 验收合格证 acceptance certificat
验收量规:  acceptance gage, acceptance gaugeacceptance gauge
房屋验收:  building inspector
验收检查 验收检查:  receiverinspection
验收项目:  items for acceptance
验收比率:  acceptance rate
验收工程师:  inspecting engineer
验收试航:  acceptance test trial trip
共同体验收:  community type-approval
Example Sentences:
1.It has reached standard and passed iso9002 authentication , and got eligibility certificate of sullage let in tai lake drainage area by the chief bureau of state environment protection
同时取得了国家环保总局关于太湖流域排污单位达标排放验收合格证。通过了iso9002国际质量体系认证。
2.The guarantee period of the equipment supplied by the seller shall expire after 12 ( twele ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract
卖方所提供的设备保质期按照合同第七章的规定:从最终验收合格证书接受日开始算起,有效期为壹年( 12个月) 。
3.The guarantee period of the equipment supplied by the seller shall expire after 12 ( twelve ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract
卖方所提供的设备保质期按照合同第七章的规定:从最终验收合格证书接受日开始算起,有效期为壹年( 12个月) 。
4.For that equipment for which operation is started before the date of the final acceptance certificate , the guarantee period of 12 ( twele ) months shall commence from the date of operation and that part of the equipment shall be deemed as accepted
如果在验收合格证没有下来之前运行设备的话,那么就默认为已经接受该设备了,并自机器运行之日起开始计算保修期( 12个月) 。
5.For that equipment for which operation is started before the date of the final acceptance certificate , the guarantee period of 12 ( twelve ) months shall commence from the date of operation and that part of the equipment shall be deemed as accepted
如果在验收合格证没有下来之前运行设备的话,那么就默认为已经接受该设备了,并自机器运行之日起开始计算保修期( 12个月) 。
6.After successful completion of the fat , thales communications shall issue and submit to the buyer ' s signature a factory acceptance certificate ( hereafter the " fac " ) , which shall be signed by the buyer not later than two ( 2 ) days from its submission thereof
在成功的完成了fat之后,泰雷兹通信公司应出具并提交给买方一份工厂验收合格证(以下称“ fac ” ) ,此验收合格证应由买方在提交后两日之内签字。
Similar Words:
"验收过程" English translation, "验收函" English translation, "验收函数" English translation, "验收合格" English translation, "验收合格标准" English translation, "验收环境" English translation, "验收环境,容许环境" English translation, "验收回单" English translation, "验收货品报告" English translation, "验收机构" English translation