Mobile
Log In Sign Up
Home > english-chinese > "协议一方" in Chinese

Chinese translation for "协议一方"

party to the agreement

Related Translations:
一方:  1.(一方面) one side; a party 短语和例子他加入了自由党一方。 he has joined the side of the liberals.2.(一个地区) an area or region; 一方当事人 one party
那一方:  yozora no mukou
水一方:  ktvlivesomewhere out there
每一方:  parties
受害一方:  injured party
自一方:  my world
聚居一方:  dwell toghter in the same region
发球一方:  serving side
守约的一方:  observant party
一方得势一方失利的情形:  zero-sum situation
Example Sentences:
1.All notices to a party shall be in writing and shall be made either via email or conventional mail
给予协议一方的通知,须以书面形式透过电邮或邮寄方式发出。
2.Should either party fail to implement the terms and conditions herein , the other party is entitled to terminate this agreement
协议一方未履行协议条款,另一方有权终止协议。
3.One of which is an authorized institution that is , a bank , a restricted licence bank or deposit - taking company ; and
协议一方是认可机构即银行有限制牌照银行或接受存款公司及
4.Either party shall not be responsible for failure or delay to perform all or any part of this agreement due to flood , fire , earthquake , draught , war or any other events which could not be predicted , controlled , avoided or overcome by the relative party
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。
5.Either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood , fire , earthquake , draught , war or any other events which could not be predicted , controlled , avoided or overcome by the relative party
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。
6.Br > either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood , fire , earthquake , draught , war or any other events which could not be predicted , controlled , avoided or overcome by the relative party
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。
7.Either party shall not be held re o ible for failure or delay to perform all or any part of this agreement due to flood , fire , earthquake , draught , war or any other events which could not be predicted , controlled , avoided or overcome by the relative party
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。
8.Force majeure : either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood , fire , earthquake , draught , war or any other events which could not be predicted , controlled , avoided or overcome by the relative party
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。
9.Force majuro : either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood , fire , earthquake , draught , war or any other events which could not be predicted , controlled , avoided or overcome by the relative party
人力不可抗拒因素:由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。
10.Force majeure : either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood , fire , earthquake , draught , war or any other events which could not be predicted , controlled , avoided or overcome by the relative party
17人力不可抗拒因素:由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。
Similar Words:
"协议寻找" Chinese translation, "协议寻址信息" Chinese translation, "协议验证" Chinese translation, "协议验证程序" Chinese translation, "协议要素" Chinese translation, "协议一致性测试报告" Chinese translation, "协议引擎" Chinese translation, "协议英汉词汇" Chinese translation, "协议映射" Chinese translation, "协议优先" Chinese translation