| 1. | The bars were welded to the deck plate . 扁钢焊接在桥面板上。 |
| 2. | The anchorages may be located on the outside of the deck . 锚碇可布置在桥面板上。 |
| 3. | Construction of deck slabs of wuhu changjiang river bridge 芜湖长江大桥桥面板施工 |
| 4. | Nonlinear fem analysis for the concrete bridge deck slab 混凝土桥面板的非线性有限元分析 |
| 5. | Bridge decking geometry design of varying width interchange 互通式立交桥桥梁桥面板变宽的几何设计 |
| 6. | Bridge deck concrete 桥面板混凝土 |
| 7. | Experimental investigation on the effects of deck constraint on the mechanical properties of reinforced concrete arch bridges 桥面板约束条件对钢筋混凝土拱桥力学性能影响的试验研究 |
| 8. | 4 . the side girders , the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time 4 、金马大桥在施工过程中采用边主梁、横隔梁和桥面板三部分分阶段一次现浇。 |
| 9. | 3 . the effective width of the deck of the cable - stayed bridge is up to profound research because there is no exactly definition in the applicable design standards 3 、由于现行的有关桥梁设计规范没有对斜拉桥主梁的有效宽度做出具体规定,从而使斜拉桥在设计中桥面板的有效宽度取值问题有待于进一步研究。 |
| 10. | The seperated pair of main ribs section was made up by bridge panel and girder , because its construction is convenient , used widely in the prestressing force concrete cable - stay bridge of large span 回答:分离式双主肋截面是由桥面板与边主梁组合而成,由于其施工方便,在大跨度预应力混凝土斜拉桥中得到广泛应用。 |